ONE LANE TRAFFIC ON MONTLAKE DRIVE

Home New Forums KUB Projects in the Neighborhood ONE LANE TRAFFIC ON MONTLAKE DRIVE

Tagged: 

This topic contains 3 replies, has 3 voices, and was last updated by  C.L. Overman 2 years, 1 month ago.

Viewing 4 posts - 1 through 4 (of 4 total)
  • Author
    Posts
  • #4289

    C.L. Overman
    Keymaster

    IN CASE YOU HAVEN’T NOTICED, ONE LANE TRAFFIC HAS BEEN ESTABLISHED TODAY ON MONTLAKE. THE SINGLE LANE TRAFFIC IS REQUIRED FOR PIPELINE CONSTRUCTION TO BORE AND INSTALL THE NEW EIGHT INCH WATERLINE ON THE NORTH SIDE OF MONTLAKE BETWEEN TIMBERLAKE AND TALL PINE. THIS PROJECT WILL TAKE APPROXIMATELY SIX WEEKS AND THE AVERAGE WAIT TIME WILL HOPEFULLY NOT EXCEED TWO MINUTES.
    qUESTIONS:
    C.L. OVERMAN 363-2663

    #4327

    David Couch
    Keymaster

    Thanks C.L. – looks like these guys are giving us a break on the weekends!

    #4364

    Lakemoor Hills
    Keymaster

    Per C.L. This morning: The contractor will be “burning in” (sealing) the asphalt patches on Lakemoor Drive today prior to the county repaving the entire street.

    #4384

    C.L. Overman
    Keymaster

    Drivers on Montlake….as you have noticed, the KUB project on Montlake is moving east toward Timberlake with the temporary traffic signals stationed at the hilltop near Timberlake and near Lakemoor. PLEASE OBSERVE THESE SIGNALS. THEY ARE THERE FOR YOUR SAFETY. I have actually seen folks run the red signal due to severe impatience and apparently bad time management. That action is dangerous to the works, yourself and is illegal. Please…we’ve known about this project for weeks so plan ahead just a little.
    Thanks
    C.L. Overman
    363-2663

Viewing 4 posts - 1 through 4 (of 4 total)